Basic Boat Info
Tax Status: Not Applicable
Make: Custom-Craft
Model: 96' 3 Masted Schooner Project
Year: 2018
Condition: Used
Category: Sail
Designer: Kasten
Construction: Aluminum
Boat Hull ID: USPOP143811
Has Hull ID: Yes
Keel Type: Other
Dimensions
Length: 96 ft / 29.26 m
Length Overall: 96 ft / 29.26 m
Beam: 23 ft / 7.01 m
Max Draft: 8 ft / 2.44 m
Other
Stock Number: 143811
Boat Class: Schooner, Sloop
Condition
This project is being sold "as is where is". The hull is currently tack welded within a fully insulated and functioning shop in Clarkston Washington on the shores of the Snake River a mere 120 miles from its mouth to the Columbia River and another 345 miles to the Pacific Ocean. Since the project currently is tack welded, final weld up and more lead for ballast need to be added. After which, she'll be ready to move to a new destination via truck or water for finishing if the buyer so desires. The shop is available for lease if the buyer decides to finish the boat on location. The hard "Bimini" top is not connected due to headroom within the shop. All specifications, cut files, blueprints, and plans are included. And, all aluminum to finish the hull is reported to be onsite. Construction began in 2005. She represents the unfulfilled dream of an ambitious, hard-working entrepreneur who ran out of time to complete her - keep the dream alive!
This project is being sold "as is where is". The hull is currently tack welded within a fully insulated and functioning shop in Clarkston Washington on the shores of the Snake River a mere 120 miles from its mouth to the Columbia River and another 345 miles to the Pacific Ocean. Since the project currently is tack welded, final weld up and more lead for ballast need to be added. After which, she'll be ready to move to a new destination via truck or water for finishing if the buyer so desires. The shop is available for lease if the buyer decides to finish the boat on location. The hard "Bimini" top is not connected due to headroom within the shop. All specifications, cut files, blueprints, and plans are included. And, all aluminum to finish the hull is reported to be onsite. Construction began in 2005. She represents the unfulfilled dream of an ambitious, hard-working entrepreneur who ran out of time to complete her - keep the dream alive!